Production

THE LIST OF THE INVESTEMENT AND REPAIR-AND-MODERNIZATION WORKS PERFOREMD BY ENERGOMONTAŻ – POZNAŃ

    1. The modernization works in the Sugar Plant “CHEŁMŻA” (modernization of the diffusion station, sugar pulp press and sugar pulp belt conveyors – erection of the BMA tower diffuser (after prior disassembling it in one of German sugar plants), including the foundation, anticorrosive and insulation works, delivery and erection of pipelines, delivery and erection of the structure, erection of the equipment).

    2. The modernization works in the Sugar Plant “GOSŁAWICE” (steam pipelines including fittings for heating boilers A1, A2, B and C, heating steam pipelines including fittings for products heating boilers A1, A2; technological connections of the product centrifuges A, B, C, pumps, juice tanks, run – off syrup tanks, germ massecuite tanks, water installation, supporting structures, bearings, fixings including the anticorrosive protection). We have also performed an erection of a thin-film evaporator including its connection to the existing technological system, a modernization of the steam and technological pipelines.

    3. The modernization works in the Sugar Plant “OPALENICA” (erection of the gallery between the sugar end department and the sugar drying room; manufacturing, delivering and erecting a steel structure in the sugar drying room; putting together and erecting 2 belt conveyors, as well as erecting steel structures within the drying room in the area on new sugar`s track; execution of a canopy for the tank chute). We have also delivered and erected the hoist beams, the supporting structures for a cutter, mingler; erection of the centrifugal separators and modernization of the service platforms.

    4. The disassembly works in the Sugar Plant “KOŚCIAN” consisting of disassembling of the calandria evaporator, thin-film evaporator, vertical mixer and pressure mixer, heat boiler, and sewage-treatment tanks (anaerobic fermentation chambers, aerobic fermentation tanks, decanter and degasser), including piping and accessory apparatuses.

    5. The modernization works in the Sugar Plant “GÓRA ŚLĄSKA” consisting of assembling of the installation disassembled previously in the Sugar Plant “KOŚCIAN” the calandria evaporator including the piping, vertical mixer and pressure mixer. The scope of works included also the delivery and erection of the supporting structure for calandria evaporator and pressure mixer, as well as modernization of the steam piping systems.

    6. The works connected to the construction of sewage-treatment plant in the Sugar Plant “ŚRODA”: assembling of the tanks disassembled previously in the sugar plant “KOŚCIAN”: anaerobic fermentation chambers, aerobic fermentation tanks, decanter and degasser, including piping and accessory equipment (along with the design work) and erection of a hydrolysis tank and a degasser including accessory piping and equipment.

    7. The modernization works in the Sugar Plant “STRZELIN” connected to the modernization of the thermal management system inside the raw product room.

    8. The modernization works in the Sugar Plant “GLINOJECK”: execution and erection of the sugar-beet transportation and cleaning process line, execution and erection of a tower diffuser of a vertical type.

    9. The modernization works in the Sugar Plant “DOBRZELIN”: modernization of the swirl equipment, raw products room and sugar packing station (execution and erection of the steel structures for the swirl equipment and cutters; execution and erection of the sugar-beet charging hoppers; erection of the sugar-beet dryer including the installations), assembling of the lime-kiln disassembled previously in the Sugar Plant Sokołów Podlaski; modernization of the sugar granulation station (assembling of the vertical mixer disassembled previously in the Sugar Plant Ostrowy) including connection to the existing system, modernization of the squeezing station (execution and assembling of the press supporting structure and erection of the press disassembled previously in the Sugar Plant Mała Wieś).

    10. The modernization works in the Sugar Plant Nakło within the framework of “Modernization of the production and swirling equipment” task: disassembling, execution and erection of the steel structure, assembling of the technological pipelines.

    11. For the order of the German company BFM we have performed the following workshop and repair works:Execution of 2 technological tanks (220 and 120 m3) of acid resistant steel for Toyota Peugeot Citroen plants in Kolin (Czech Republic).Execution of technological tanks of black steel (200 m3) and acid resistant (2 units of 80 m3 each,1 unit of 12m3) for the Dimler-Chrystler plant in Ludwigsfelde (Germany).

      Steel structure of drift fenders shields for the Kronospan plant in Jihlava (Czech Republic).

      Replacement of heating inserts of the drum dryers in the Genk plant (Belgium).

           Renovation of heating insert of the drum dryers in the Jihlava (Czech Republic), Genk (Belgium) and Wielsbeke (Belgium) plants.

    12. Execution and erection of the granulated product dryer within the framework of modernization of the Central Waste-Water Treatment Plant for the city of Poznań.

THE LIST OF THE INVESTEMENT, REPAIR AND MODERNIZATION WORKS PERFORMED BY THE INCORPORATED COMPANY “ENERGOMONTAŻ – ZACHÓD POZNAŃ”

  1. The Sugar Plant “OPALENICA” erection of the infuser and BMA vertical diffuser (after prior disassembling it in one of the German sugar plants), gravity operated evaporator, worm and belt conveyors, delivery and erection of technological pipelines (including the acid resistant ones), delivery and erection of the steel structures.

  2. The sugar plant “ŚRODA” modernization of the sugar-beet warehouse, of the raw product room and the production room, erection of the BMA diffuser, the diffuser and press station equipment, delivery and erection of the steel structures, adaptation of conveyors and pipe-racks, execution and erection of the steel structure of the beet pulp warehouse, completion and erection of the technological pipelines (including the acid resistant).

  3. The Sugar Plant “GOSTYŃ” erection of BMA tower diffuser, erection of technological equipment and pipelines in the raw products warehouse, production area and thermal management room,

  4. The Sugar Plant “MIEJSKA GÓRKA” modernization of the production area, of the sugar dryer room and thermal management room: delivery and erection of the steel structure, completion and erection of the technological pipelines, erection of the technological equipment.

  5. The Sugar Plant “KOŚCIAN” installing the evaporator in the division IVA including the supporting structure and piping, delivery and erection of the steel structure for the thin-film evaporator, modernization of production area in the scope of completion and erection of the pipelines, delivery and erection of the steel structure and erection of the technological equipment, modernization of vapour and juice pipeline system related to the erection of the panel heaters, modernization of thin-film equipment in the department III, repair of the water heater and screens of OR-32 boilers.

  6. The sugar plants “GNIEZNO” and “OSTROWY” erecting and starting-up of 6,3 MW turbines, steam boilers, accessory equipment and erection of pipelines.

  7. The sugar plants “GNIEZNO”, “ŚRODA” i “ZDUNY”: erection of boilers, turbines, accessory equipment and steel structures.

  8. The Sugar Plant “GÓRA” execution and erection of the silos steel structure.