LIST OF WORK PERFORMED BY ENERGOMONTAŻ-POZNAŃ SINCE 2006
Sugar Indastry
Krajowa Spółka Cukrowa S.A.
“Dobrzelin Sugar Refinery” Branch in Dobrzelin,
- 2013 – Beet plant overhaul
- 2007 – Disassembly and installation of presses and agitators
- 2006 – Lime plant modernization
“Kluczewo Sugar Refinery” Branch in Stargard,
- 2017 – Replacement of boiler room exchangers and chutes
- 2013 – Delivery and installation of pipelines
- 2012 – Delivery and installation of pipelines
- 2011 – Disassembly, repair, and installation of a diffusion tower. Execution and installation of structures and pipelines, as well as equipment installation in the vicinity of the diffusion station
- 2010 – Equipment scrapping
- 2009 – Beet plant modernization
“Krasnystaw Sugar Refinery” Branch in Siennica Nadolna,
- 2020 – Overhaul – setting scrappers in the brewing unit
- 2019 – Diffuser and brewing unit installation with insulation
- Delivery and installation of diffusion station structures and equipment
- Delivery and installation of diffusion station pipelines
- Overhaul of the water condensation tank and evaporator
- Evaporator overhaul
“Kruszwica Sugar Refinery” Branch in Kruszwica
- 2016
- Installation of diffuser and brewing unit
- Installation of equipment, diffusion station structures and pipelines
- Reconstruction of the press station and the beet washing and conveyor station
- Disassembly of the beet conveyor structure
- Execution and delivery of 2 juice heaters
- 2015
- Lime plant modernization – delivery and installation of the furnace, selected equipment, and systems
- Delivery and installation of the slacker
- 2014 – Delivery and installation of beet bunkers
- 2013
- Installation of juice heaters
- Filter shifting
- 2012 – Beet plant modernization
“Malbork Sugar Refinery” Branch in Malbork
- 2021
- Prefabrication of the diffuser operating section
- Installation of diffuser and brewing unit
- Execution and installation of the steel structures for the presses and building interior
- 2016 – Installation of diffuser and brewing unit
“Nakło Sugar Refinery” Branch in Nakło nad Notecią
- 2018
- execution and installation of a juice tank V=30,000 m3
- Installation of diffusion tower and brewing unit
- expansion of the diffusion station, delivery and installation of structures and pipelines
- 2016 – Beet plant and beet cutting station modernization
- 2013 – Overhaul of vacuum systems
- 2007 – Sugar end and centrifugery modernization
- “Werbkowice Sugar Refinery” Branch in Werbkowice.
- 2015
- Installation of a diffusion tower with extraction station modernization
- Delivery and installation of pipelines and small structures
- 2008
- Disassembly of an old lime kiln
- Delivery and installation of a new lime kiln with batch feed line modernization
Nordzucker Polska S.A
Chełmża Sugar Refinery
Opalenica Sugar Refinery
- 2021 – Delivery and installation of 2 fillmass agitators
- – Delivery and installation of sugar end pipelines
- – Beet pulp press overhaul
- 2020 – KVO630 brewing unit gear disassembly
- 2019 – Brewing unit overhaul with plating replacement
- – RS64, 68 beet pulp press installation
- – Cold liming defecation tank overhaul
- – Agitator overhaul – mechanical part
- 2018 – Execution and installation of structure for seed fillmass discharge agitator
- 2017 – Slacker modernization
- – Belt conveyor general overhaul
- – Building and gallery overhaul
- – Welding work within the sugar end and strike pan drains
- 2016 – Beet washing system installation
- 2015 – Modernization of structures, equipment and pipelines within the beet bunker and slicers
- 2014 – Delivery and installation of a decanter with casing
- 2013 – Beet washer overhaul
- – Domestic sewage pipeline overhaul
- – Sugar drier overhaul – 2 pcs
- – Execution of steel structures and filter installation
- – Roof structure execution
- – Press overhaul
- 2012 – Toothed gear replacement in the vertical diffuser
Pfeifer & Langen Polska S.A.
Glinojeck Sugar Refinery
- 2020 – Bottom diffuser bearing replacement
- – Bottom diffuser bearing seal installation
- 2014 – Diffusion tower installation
- – Delivery and installation of structures, installation of conveyors and brewing unit
- – Delivery and installation of pulp and stalk flyover
- – Thermal system modernization
- 2011 – Fillmass vertical agitator III – disassembly and transport from the Netherlands, installation in Glinojeck
- 2009 – Execution and installation of boiler flue gas purification for saturation
- 2007 – Execution and replacement of skip track bed and upper platform on two lime kilns
- – Beet plant modernization
- 2006 – Diffusion tower installation
- – Slicer and press installation
- – Execution and installation of steel structures
- – Delivery and installation of pipelines
Gostyń Sugar Refinery
- 2007 Evaporator section system replacement
Miejska Górka Sugar Refinery
- 2012 – Diffusion tower installation (diffuser transferred from the Środa Wlkp. Sugar Refinery).
Środa Wielkopolska Sugar Refinery
- 2019 – delivery and installation of various structures
- 2018 – installation of diffusion tower and brewing unit
- – execution and installation of diffusion station structures
- – execution and installation of evaporator station structures
- – installation of diffusion station equipment
- – installation of evaporator station equipment
- – delivery and installation of diffusion station pipelines
- – delivery and installation of evaporator station pipelines
- – delivery and installation of return steam pipelines
- – disassembly of structures, equipment and pipelines within the diffusion, press, slicer, water condensation and evaporator stations
- – disassembly of the gas pipeline and air tanks
- – delivery and installation of heater building casing – evaporator station
- – execution and delivery of water condensation tank and 3 expansion tanks
- 2011 – Installation of heaters and pipelines
- 2010 – Diffuser plating repair
- 2008 – BMA diffusion tower installation
- – Execution and installation of water tower structure with equipment and pipeline installation
- – Installation of barometric water pump station equipment and pipelines
- – Installation of cooling tower equipment
- – Execution and installation of evaporator station supporting structures
- – Execution and installation of supporting structure for the centrifuge station
- – Disassembly at the “Gosławice” sugar refinery, transport and installation at the Środa Wlkp. sugar refinery.
- – Installation of 6 centrifuges
- – Installation of 3 separators above the centrifuges
- – Delivery and installation of thermal management modernization pipelines
- – Delivery and installation of extraction station juice pipelines
- – Delivery and installation of roof structures
- – Disassembly and installation of heat juicers and water condensation unit with necessary pipelines
- – Delivery and installation of evaporator station pipeline supports
- – Delivery and installation of sugar end and diffusion station pipelines
- – Delivery and installation of raw juice pipelines
- – Delivery and installation of strike pan platforms
- – Installation of pre-liming apparatus with pipelines and service platforms
- – Delivery and installation of bi-section water condensation unit
- 2007 – Repair and preparation for the installation of the diffuser and brewing unit with froth breaker
Südzucker Polska S.A.
Cerekiew Sugar Refinery
- 2021 – Transfer and installation of 2 agitators, installation of piping
- – Diffusion station – Equipment, structures and pipelines
- 2020 – MS80 Stord press overhaul
- – Sectioning of the 200t tank
- – Transfer and installation of 2 agitators, installation of piping
- – Diffusion station – Equipment, structures and pipelines
- 2017 – Execution and installation of decanter
- – Overhaul and installation of presses
- – Coal conveyor modernization
- 2014 – Beet pulp press overhaul and installation
Ropczyce Sugar Refinery
- 2019 – Diffuser toothed gear replacement
- – Removal of old, and then installation of new diffuser glands
- 2011 – Diffuser repair
- 2010 – Disassembly (in Groningen), transport, repair and installation of the diffuser and auxiliary equipment
- – Execution and installation of structures, process systems and installation of diffusion station equipment.
Strzelin Sugar Refinery
- 2020 – Diffuser drive overhaul
- 2018 – execution and installation of molasses tank V=15,000 m3
- 2017 – Execution and installation of decanter
- 2015 – Evaporator section III modernization
- – Installation of strike pans with piping
- – Installation of candle filters with piping and platforms
- – Installation of plate evaporator with piping
- 2013 – Execution and installation of structures and pipelines
- 2012 – Evaporator station modernization
- 2011 – Sugar end modernization
- – Execution and installation of beet bunkers and roof structure
- 2009 – Installation of diffuser with piping
- – Execution and installation of various structures
- – Execution and installation of diffuser roof structure
- – Installation of slicers, presses and beet pulp transport equipment
- – Delivery and installation of process pipelines
Świdnica Sugar Refinery
- 2013 – Execution and installation of structures and pipelines
- 2012 – Extraction station modernization – structures, equipment and pipelines
- – Diffusion tower installation
- 2011 – Transport from the Netherlands and repair of the diffusion tower
Industry
Kronospan Szczecinek
- 2019 – Installation of additional R2 screw systems
- 2017 – Overhaul and maintenance work
- 2016 – Execution and replacement (1 element) of the GTS boiler duct
- – ECiU hall thermal oil system overhaul
- 2015 – Delivery of a rainfall evaporator F=2200m2
- – Installation of the evaporator and process tanks with structure and piping
- – Installation of steam generator and process tanks with piping
- 2014 – Oil pipeline overhaul
- – Delivery and installation of flue gas ducts
- – Execution of 18 cyclone units
- 2013 – Installation of thermal oil pipelines
- – Air duct execution
- 2012 – Execution and installation of carbon and acid-resistant steel ducting
Kronospan Strzelce Opolskie
- 2019 – Prefabrication of 196 Mg + 53 Mg structures
- – Delivery and installation of thermal oil piping
- – Prefabrication and installation of the cable rack
- – Installation of the OSB recycling structure
- 2016 – Installation of Hymmen process line thermal oil system
Kronospan Mielec
- 2016 – Thermal oil system reconstruction
Swiss Krono Żary
- 2021 – Delivery and installation of urea and water pipelines
- – Delivery and installation of pipelines
- 2020 – Delivery and installation of pipelines
- 2019 – GEKA 1 multi-cyclone service platform overhaul
- – Kablitz fuel hopper overhaul
- – Fire-fighting pipeline installation
- 2018 – overhaul work
- 2017 – Thermal oil system reconstruction
- – Replacement of boiler room exchangers and chutes
- 2014 – Pipeline and equipment installation
- – Dryer drum overhaul and Redler replacement
Siekerki CHPP
- 2020 – K-11 boiler flue gas duct disassembly and installation
- 2014 – K-11 boiler overhaul
PEPEES S.A. in Łomża
- 2014 – Stone trap installation
SWEDSPAN Polska Sp. z o.o.
- 2010 – Sefako heat recovery boiler installation
- 2011 – Installation of boiler room pipelines for Dieffenbacher GmbH + Co.KG
Nowa Dolina Nidy Sp. z o.o.
2008 – Execution of a Ø=14000mm, h=11700mm silo with 1.4301 steel cladding
FOR NATURE Żagań
- 2006 – Execution of two V = 80 m3 silos with platforms, ladders and pipelines
Construction
Aesculap Nowy Tomyśl (B.Braun)
- 2019 – Steel structure execution and erection
Jakon
- 2015 –VW Antoninek steel structure erection
- – Delivery and installation of structures at the Jenox – Chodzież hall
PBT-Zachód S.A.
- 2015 – Delivery and installation of Kostrzyn hall structures
Elwoz
- 2015 – Delivery and installation of Chwaszczyno hall structures
- 2013 – Execution and installation of structures in Chlewnica
Budimex
- 2015 – Delivery and installation of the Waste Management Authority – Ostrów Wlkp.
- – Delivery and installation of structures for Bayond-Poznań
Budimex Dromex S.A.
- 2009 – Delivery and installation of Sludge Dryer platform in WWTP-Koziegłowy
- 2008 – Installation of the Sludge Dryer bag filter in WWTP-Koziegłowy
- 2007 – Relocation of the Sludge Dryer bag filter in WWTP-Koziegłowy
Rembor
- 2015 – Delivery and installation of agricultural facilities
P&P Spółka z o.o.
- 2014 – Execution and installation of hall structures
Bud-Instal
- 2014 – Execution and installation of warehouse building structures
Mostostal Kielce S.A.
- 2009 – Installation of the steel structure within the “Fordon” wastewater treatment plant in Bydgoszcz
- – Installation of the steel structure for an Adam Mickiewiczy University in Poznań building
Mostostal Warszawa
- 2013 – Execution and erection of a WD-1 viaduct structure over the Opalenica ring-road (road No. 307)
PBO Anioła
- 2013 – Execution and installation of hall structures
Eurokonstruction
- 2007 – Execution of the hall steel structure
J. KONSTRUKTOR
- 2013 – Execution of the hall steel structure
ALUMEN Sp. z o.o.
- 2006 – Execution of the roofing steel structure for the CKH Stary Browar courtyard
Abroad
Belarus
Kronospan – Smorgon
- 2017-2018 – installation of a ContiRoll process press with equipment and pipelines
Belgium
Cukrownia Brugelette
- 2009 – equipment disassembly
Germany
Brottewitz Sugar Refinery
- 2020 – disassembly and transport of 5 evaporators
Delitzsch Sugar Refinery
- 2008 – Brewing unit disassembly
Elsdorf Sugar Refinery
- 2008 – Equipment and piping disassembly and their loading onto means of transport
- 2007 – Equipment disassembly and loading onto means of transport
Regensburg Sugar Refinery
- 2010 – equipment disassembly
- 2008 – installation of diffusion tower and two brewing units
Bifinger
- 2016 – Pipeline prefabrication
Dieffenbacher
- 2012 – Pipeline prefabrication
BIS Rohrleitungsban
- 2012 – Pipeline prefabrication
Bertsch
- 2011 – Pipeline installation
Romania
Oradea Sugar Refinery
- 2013 – Execution and delivery of beet transport chutes made of Hardox steel
- 2010 – Lime plant modernization
- – Diffusion tower installation
Sweden
Boden
- 2006 – Installation of a Sefako heat recovery boiler