Implementations

We present projects created for our clients.

 STATEMENT OF WORKS ENERGOMONTAŻ – POZNAŃ SINCE 2006

Sugar Industry

National Sugar Company S.A.

Branch “Dobrzelin Sugar Factory” in Dobrzelin,

  • 2013r. – Beet plant renovation
  • 2007r. – Removal and installation of presses and mixer
  • 2006r. – Modernization of the lime plant

Branch “Kluczewo Sugar Factory” in Stargard,

  • 2017r. – Replacement of boiler room exchangers and chutes
  • 2013r. – Supply and installation of pipelines
  • 2012r. – Supply and installation of pipelines
  • 2011r.
    • Removal, repair and installation of the tower diffuser
    • Construction, installation of structures and pipelines, and installation of the device in the area of the diffusion station
  • 2010r. – Scrap dismantling of equipment
  • 2009r. – Beet plant modernization

Branch “Krasnystaw Sugar Factory” in Siennica Nadolna,

  • 2020r. – Renovation – setting scrapers in the brewery
  • 2019r.
    • Installation of the diffuser and brewer with insulation
    • Supply and installation of structures and equipment at the diffusion station
    • Supply and installation of pipelines at the diffusion station
    • Repair of the water maker and evaporator pipeline
    • Overhaul of evaporators

Branch “Cukrownia Kruszwica” in Kruszwica

  • 2016r.
    • Installation of the diffuser and igniter
    • Installation of equipment, structures and pipelines of the diffusion station
    • Reconstruction of the baler station and beet washing and transport station
    • Disassembly of beet conveyor structure
    • Manufacture and delivery of 2 juice warmers
  • 2015r.
    • Modernization of the lime kiln – supply and installation of the kiln, selected equipment and installations
    • Supply and installation of a lasering machine
  • 2014r. – Delivery and installation of beet bunkers
  • 2013r.
    • Installation of juice warmers
    • Filter offset
  • 2012r. – Beet plant modernization

Malbork Sugar Factory” branch in Malbork,

  • 2021r.
    • Prefabrication of the diffuser working part
    • Installation of the diffuser and brewer
    • Fabrication and installation of the steel structure of the presses and inside the building
  • 2016r. – Installation of the diffuser and brewer

Naklo Sugar Factory” branch in Naklo nad Notcią,

  • 2018r.
    • construction and installation of a juice tank V= 30,000m3
    • installation of tower diffuser and brewer
    • Expansion of the diffusion station, supply and installation of structures and pipelines
  • 2016r. – Modernization of beet and beet cutting plant
  • 2013r. – Overhaul of vacuum systems
  • 2007r. – Modernization of the product and centrifugation plant

Branch “Werbkowice Sugar Factory” in Werbkowice.

  • 2015r.
    • Installation of tower diffuser with extraction station upgrade
    • Supply and installation of pipelines and small structures
  • 2008r.
    • Removal of the old lime kiln
    • Supply and installation of a new lime kiln with modernization of the batch loading line

Nordzucker  Polska S.A

Chelmza Sugar Factory

Opalenica Sugar Factory

2021r. – Supply and installation of 2 pcs of diabetic mixers

– Supply and installation of product plant pipelines

– Overhaul of pulp presses

2020r. – D-gear of brewing machine KVO630

2019r. – Overhaul of the brewer with replacement of the platter

– Installation of pulp presses RS64, 68

– Renovation of the cold defecation tank

– Overhaul of the mixer – mechanical part

2018r. – Construction and m-ż of the structure for the drain mixer of the embryonic diabetes mellitus

2017r. – Modernization of the forestry plant

– Overhaul of conveyor belts

– Renovation of the building and gallery

– Welding work within the product room and brewhouse drains

2016r. – Installation of the beet washing plant

2015r. – Modernization of structures, equipment and pipelines within the beet bunker and slicers


2014r. – Delivery and installation of a decanter with an enclosure

2013r. – Renovation of the beet scrubber

– Renovation of domestic wastewater pipelines

– Renovation of sugar dryers – 2 units.

– Construction of the steel structure and installation of filters

– Construction of the roof structure

– Overhaul of presses

2012r. – Replacement of the gear wheel in the vertical diffuser

Pfeifer & Langen Polska S.A.

Glinojeck sugar factory

2020r. – Replacement of the lower diffuser bearing

– Installation of a seal for the lower diffuser bearing

2014r. – Installation of the tower diffuser

– Supply and installation of structure, installation of conveyors and brewer

– Supply and installation of pulp and tailings flyover


– Modernization of the thermal system

2011r. – Diabetes III vertical mixer – disassembly and transport from the Netherlands and installation in Glinojecko

2009r. – Construction and installation of boiler flue gas cleaning system for carbonation

2007r. – Construction and replacement of the skip substructure and upper platform on two lime kilns

– Modernization of the beetroot plant

2006r. – Installation of a tower diffuser

– Installation of slicers and presses

– Fabrication and installation of steel structures

– Delivery and assembly of pipelines

Gostyń Sugar Factory

2007r. Replacement of the installation of the evaporator department

Sugar factory Miejska Górka

2012r. – Installation of tower diffuser (transfer of diffuser from Środa Wielkopolska Sugar Factory).

Środa Wielkopolska Sugar Factory

2019r. – Supply and installation of miscellaneous structures

2018r. – installation of the tower diffuser and brewer

– manufacture and assembly of structures on the diffusion station

– execution and installation of structures on the evaporation station

– installation of equipment in the area of the diffusion station

– installation of equipment in the area of the evaporation station

– delivery and installation of pipelines in the area of the diffusion station

– supply and installation of pipelines in the evaporation station area

– delivery and installation of retort steam pipelines

– dismantling of structures, equipment and pipelines in the area of diffusion, presses, slicers, water maker and evaporators

– demolition of gas pipelines and air tanks

– supply and installation of the housing of the heaters building – evaporation station

– execution and delivery of a water heater and 3 expansion tanks

2011r. – Installation of heaters and pipelines

2010r. – Repair of the diffuser plating

2008r. – Installation of the BMA tower diffuser

– Fabrication and installation of water tower structure including installation of equipment and piping

– Installation of barometric water pumping station equipment and pipelines

– Installation of fan cooling tower equipment

– Execution and installation of the support structure of the evaporation station

– Execution and assembly of the support structure for the centrifuge station

– Dismantling in sugar factory “Gosławice”, transport and assembly of equipment in sugar factory “Środa wlkp”.

– Assembly of 6 pieces of centrifuges

– Assembly of 3 pieces of distributors over the centrifuges

– Delivery and installation of pipelines for modernization of thermal management

– Supply and installation of juice pipelines of the extraction station


– Delivery and installation of the roof structure

– Dismantling and installation of juice heaters and water maker along with necessary pipelines

– Delivery and installation of evaporation station piping supports

– Delivery and installation of product room pipelines, diffusion station

– Supply and installation of raw juice pipelines

– Delivery and installation of platforms under the brewers

– Installation of the pre-defect apparatus including pipelines and service platforms

– Delivery and installation of a two-section watering machine

2007r. – Repair with preparation for installation of diffuser and brewing machine with skimmer

Südzucker Polska S.A.

Cerekiew sugar factory

2021r. – Relocation of mixers, m-ż 2 evaporators, m-ż piping

– Diffusion station – Equipment, structures and pipelines

2020r. – Overhaul of stord MS80 press


– Division of 200 t tank

– Relocation of mixers, m-ż 2 evaporators, m-ż piping

– Diffusion station – Equipment, structures and piping

2017r. – Execution and installation of the decanter

– Execution of overhaul and installation of presses

– Modernization of coal conveyor

2014r. – Overhaul and installation of pulp presses

Ropczyce sugar factory

2019r. – Replacement of the gear wheel in the diffuser

– Removal of old and installation of new glands in the diffuser

2011r. – Repair of the diffuser

2010r. – Dismantling (in Groningen), transportation, repair and installation of the diffuser and associated equipment

– Fabrication and assembly of structures, process installations and installation of equipment at the station

diffusion

Strzelin sugar factory

2020r. – Repair of diffuser drives

2018r. – Construction and installation of a molasses tank V=15,000 m3

2017r. – Construction and installation of the decanter

2015r. – Modernization of the 3rd evaporation department

– Installation of brewers together with piping

– Installation of candle filters together with piping and platforms

– Installation of plate evaporator along with piping

2013r. – Fabrication and installation of structures and piping

2012r. – Modernization of the evaporator station

2011r. – Modernization of the product room

– Construction and installation of beet bunkers and roof structure

2009r. – Installation of diffuser with piping

– Fabrication and installation of miscellaneous structures

– Execution and installation of the diffuser roof structure

– Assembly of slicers, presses and pulp transport equipment

– Delivery and assembly of technological pipelines

Świdnica Sugar Factory

2013r. – Execution and assembly of structures and pipelines

2012r. – Modernization of the extraction station – structures, equipment, pipelines

– Installation of a tower diffuser

2011r. – Transportation from the Netherlands and repair of the tower diffuser

Industry

Kronospan Szczecinek

2019r. – Installation of additional installations of the R2 auger

2017r. – Repair and maintenance work

2016r. – Construction and replacement (1 element) of the duct for the GTS boiler.

– Renovation of the thermal oil installation of the ECiU hall

2015r. – Delivery of a precipitation evaporator F=2200m2

– Installation of the evaporator and process tanks with structure and pipelines

– Assembly of the steam generator and process tanks together with pipelines

2014r. – Repair of oil pipelines

– Delivery and assembly of flue gas ducts

– Construction of 18 cyclones

2013r. – Installation of thermal oil pipelines

– Execution of air ducts

2012r. – Execution and assembly of carbon and acid-resistant steel ducts

Kronospan Strzelce Opolskie

2019r. – Prefabrication of Structures 196 Mg + 53 Mg

– Supply and installation of thermo oil pipelines

– Prefabrication and assembly of the cable flyover

– Assembly of OSB recycling structure

2016r. – Assembly of thermal oil installation of Hymmen process line

Kronospan Mielec


2016r. – Reconstruction of thermo oil installation

Swiss Krono Żary

2021r. – Supply and installation of urea and water pipelines

– Supply and installation of pipelines

2020r. – Supply and installation of pipelines

2019r. – Renovation of the service platform of the GEKA 1 multicyclone

– Renovation of the Kablitz fuel hopper

– Installation of fire fighting pipelines

2018r. – repair works

2017r. – Reconstruction of the thermo-oil system

– Replacement of boiler room exchangers and chutes

2014r. – Installation of pipelines and equipment

– Dryer drum renovation and Redler replacement

Siekierki CHP plant

2020r. – Disassembly and installation of flue gas ducts of boiler K-11

2014r. – Overhaul of K-11 boiler

PEPEES S.A. in Łomża

2014r. – Installation of a stone catcher

SWEDSPAN Polska Sp. z o.o.

2010r. – Assembly of recovery boiler of Sefako company.

2011r. – Assembly of boiler house pipelines for company Dieffenbacher GmbH + Co.KG.

Nowa Dolina Nidy Sp. z o.o.

2008r. – Construction of a silo fi=14000mm, h=11700mm together with a lining of 1.4301 steel

FOR NATURE Żagań

2006r. – Construction of 2 silos V = 80m3 together with platforms, ladders and pipelines

Construction

Aesculap Nowy Tomyśl (B.Braun)

2019r. – Construction and installation of a steel structure

Jakon

2015r.
Assembly of the steel structure of VW Antoninek

– Delivery and assembly of the structure of the Jenox hall – Chodzież

PBT-Zachód S.A.

2015r. – Delivery and assembly of the hall structure Kostrzyn

Elwoz

2015r. – Delivery and assembly of the hall structure – Chwaszczyno

2013r. – Delivery and assembly of the structure – Chlewnica

Budimex


2015r. – Delivery and assembly of the hall structure for the Waste Management Plant – Ostrów Wlkp.

– Delivery and assembly of the construction of Bayond- Poznań

Budimex Dromex S.A.

2009r. – Fabrication and assembly of platforms of the Sludge Drying Plant at COŚ-Koziegłowy

2008r. – Assembly of the bag filter of the Sludge Drying Plant at COŚ-Koziegłowy

2007r. Relocation of the bag filter of the Sludge Drying Plant at COŚ-Koziegłowy.

Rembor

2015r. – Supply and installation of structures for farm facilities

P&P Spółka z o.o.

2014r. – Supply and assembly of hall structures

Bud-Instal

2014r. – Construction and assembly of the warehouse building structure

Mostostal Kielce S.A.

2009r. – Assembly of steel structure on the premises of the sewage treatment plant “Fordon” in Bydgoszcz

– Assembly of the steel structure of the UAM building in Poznań

Mostostal Warsaw

2013r. – Construction and assembly of the WD-1 viaduct structure on the Opalenica bypass(road no. 307).

PBO Angel

2013r. – Construction and assembly of the hall structure

Eurokonstruction

2007r. – Construction of the steel structure of the hall

P. J. KONSTRUKTOR

2013r. – Construction of the steel structure of the hall

ALUMEN Sp. z o.o.

2006r. – Construction of the steel structure of the canopy of the courtyard of CKH Stary Browar.

Abroad

Belarus

Kronospan – Smorgon

2017-2018r. – Installation of ContiRoll type technological press together with accessories and pipelines

Belgium

Brugelette sugar factory

2009r. – dismantling of equipment

Germany

Brottewitz sugar factory

2020r. – D-ż and transport of 5 evaporators

Delitzsch sugar factory

2008r. – Dismantling of the brewer

Elsdorf sugar factory

2008r. – Dismantling of equipment and pipelines and their loading onto transportation vehicles

2007r. – Dismantling of equipment and their loading onto means of transport

Regensburg sugar factory

2010r. – Dismantling of equipment

2008r. – Disassembly of a tower diffuser and two brewers

Bifinger

2016r. – Prefabrication of pipelines

Dieffenbacher

2012r. – Prefabrication of pipelines

BIS Rohrleitungsban

2012r. – Prefabrication of pipelines

Bertsch

2011r. – Pipeline assembly

Romania

Oradea sugar factory

2013r. – Production and delivery of beet transport gutters made of Hardox steel

2010r. – Modernization of the lime plant

– Installation of a tower diffuser

Sweden

Boden

2006r. – Installation of a recovery boiler manufactured by Sefako